Introduction
Good Manufacturing Practices (GMP) lie at the heart of trust in pharmaceutical products. When opening a new facility, compliance with GMP is not optional - regulators worldwide demand rigorous adherence. This checklist helps you ensure your new facility meets both Indian and global (FDA, EMA, PIC/S) expectations.
Adroitix Engineering, expert EU GMP facility design consultants, ensures full compliance with global GMP standards for new pharma facilities. From layout planning to cleanroom design and validation, Adroitix integrates regulatory guidelines into every stage of development, helping clients build facilities that meet stringent EU quality, safety, and documentation requirements for seamless global regulatory approval.
GMP Compliance Checklist
Below is a structured checklist, grouped by domain, that you should verify before commissioning or audit:
Domain |
Key Items |
Notes / Acceptance Criteria |
Organization & Personnel |
GMP training program; organization chart with responsibilities; hygiene & gowning practices |
Documented training records, access controls |
Building & Facilities |
Cleanroom classification & pressure cascade; material & personnel flow; surface finishes; gowning rooms; maintenance access |
Floor, wall, ceiling materials compatible with cleaning |
Utilities & Services |
HVAC design for pharma manufacturing, compressed air, steam, chilled water, vacuum, nitrogen, electrical systems |
Redundancy, alarms, monitoring |
Water Systems |
PW system, WFI system, piping design, sampling points, sanitization |
Temperature, conductivity, TOC, microbial limits |
Equipment |
GMP grade equipment, material of construction, cleanability, calibration, spare parts |
FAT/SAT, preventive maintenance |
Qualification & Validation |
DQ, IQ, OQ, PQ; cleaning validation, process validation, computer system validation |
Protocols + reports, traceability |
Quality Management System (QMS) |
SOPs, change control, deviation/CAPA, audit program, management review |
Documented control, version management |
Documentation & Records |
Batch records, calibration, maintenance logs, cleaning logs, deviation reports |
Document control, retention policy |
Raw Materials & Incoming |
Vendor qualification, certificate of analysis (COA), quarantine, sampling, testing |
Supplier audit records |
Production & Process Controls |
In-process controls (IPCs), monitoring, controls on critical process parameters |
Statistical justification, sampling |
Microbiology & Environmental Monitoring |
Viable & non-viable particle monitoring, microbial limits, trend review |
Defined frequency, control limits |
Laboratory Controls |
Validated analytical methods, calibration of instruments, reference standards |
Stability studies, control charts |
Computer Systems / Automation |
Software validation, audit trails, data integrity (21 CFR Part 11 or equivalent) |
Change control in software, user access |
Change Control & Deviation Handling |
Formal process for changes, risk assessment, impact analysis |
CAPA tracking, review board |
Complaint & Recall Handling |
Procedures, investigation, trending, recall readiness |
Simulation of mock recall |
Security & Access Control |
Access restrictions (clean zone doors, electronic locks), CCTV, personnel ID |
Logs, periodic reviews |
Maintenance & Housekeeping |
Preventive maintenance schedule, cleaning SOPs, pest control |
Logs, inspection checklists |
Environmental & Waste |
ETP, effluent disposal, hazardous waste management, solvent recovery |
Regulatory compliance, emission norms |
Calibration & Metrology |
Calibration intervals, traceability to standards, master equipment list |
Calibration certificates & logs |
Personnel Safety & Training |
PPE, safety SOPs, emergency response, fire drills |
Safety audits, mock drills |
Additional Considerations
Conclusion
This GMP compliance checklist acts as your guide to systematically confirming every critical component is in place before operations. A rigorous review against this list helps diminish audit observations, ensure product quality, and safeguard regulatory approval.